Property Care Specialists Across London020 8970 7471  ·  [email protected]  ·  WhatsApp 07950 225214
Home / Customer Aftercare
After remedial work

Drying, ventilation and decorating aftercare.

The correct aftercare depends on the system, substrate and work completed. Follow the project-specific written guidance supplied with your quotation or completion documents.

Allow dryingTimes vary by construction
Ventilate sensiblyAvoid trapping moisture
Decorate at the right timeUse compatible systems
Ask when unsureProject-specific advice wins

During drying

  • Maintain reasonable background heating where advised
  • Use ventilation without creating extreme temperature changes
  • Expect drying times to vary with wall thickness, weather and occupancy
  • Do not cover drying surfaces with impermeable finishes prematurely

Before decorating

  • Confirm the surface is ready
  • Use the primer and paint system specified for the substrate
  • Avoid standard finishes where specialist breathable or compatible products are required
  • Keep photographs and product information for your records

Contact Sherifi Group when

  • New water entry appears
  • Cracking, detachment or unusual movement develops
  • A pump or drainage alarm activates
  • You are unsure whether a surface is ready to decorate
Assessment & quotation

Request an assessment.

Send the postcode, property type, photographs and a brief description. We will help identify the most useful next step.

Free quotations are available for clearly defined remedial works. A Professional Damp Survey & Written Report is £220 + VAT and includes findings, photographic evidence and written recommendations.

Call
020 8970 7471

WhatsApp
07950 225214

Email
[email protected]

    Include the room or elevation, timing, visible signs and any previous repair.

    JPG, PNG, WebP or PDF up to 8 MB.

    Call officeWhatsApp
    WhatsApp